Balico Pittsylvania Data Center + Gas Plant (withdrawn)
RumoredData CenterBalico
Chatham, Pittsylvania County, VA
Verification60/100
How corroborated this project is, 0 to 100, built from primary evidence: permits, utility interconnection filings, procurement notices and hiring activity. Higher means more independent sources confirm it.
Balico proposed a large data-center complex with on-site natural-gas generation on 2,200+ acres in Pittsylvania County, near Mountain Valley Pipeline infrastructure, reported at up to $3.7B over a 10-15 year build-out. The original proposal (with a much larger gas plant) was withdrawn in April 2025 after resident pushback; a scaled-back ~300 MW version was floated. Included as a speculative/withdrawn Southside project.
Investment$3.7B
Power demand300 MW
Jobs80
Serving utilityDominion Energy Virginia
Development stage
- Site Selection
- Pre-Construction
- Permitting
- Construction
Project timeline
Every detected update, newest first
No events recorded yet.
Procurement opportunities
Paid plan
- No opportunities detected yet.